Language: EN FR
Home > Machinery > Filling Machine > Gallon Filling Machine > Gallon Bottling Machine

Gallon Bottling Machine

    Title: 6 row 18.9L 3 in 1 gallon filling line with stainless steel pipe

    Key words: gallon filling machine, gallong filling line, gallon filling equipment


Inquire Now
  • Quick Details
  • Detailed Descriptions
  • Packaging & Delivery
  • Services

    QUICK DETAILS:

    Model: QGF-900

    Brand: FILL-PACK

    Power: 21.5kw

    Voltage: 380V 3PH 50HZ or customized

    Driven force type: Electrical

    Automation degree: Automatic

    Dimension: 5500*3350*2700mm

    Weight: 1800 KG

    Application: gallon filling

    Packing category: Gallon bottle

    Packing material: PET PC

    Condition: New


    PROPERTIES:

    Capacity: 0-900 BPH

    Applicable bottle size: 5 gallon

    Key material: SUS304

    Fuction: gallon filling

    Origin: ZhangJiaGang, China

    After sales service: Engineers avaliable to service overseas

    Qualification: CE, ISO9001-2008


    6 row 18.9L 3 in 1 gallon filling line with stainless steel pipe

    Working process:

    Gallon filling line can be divided into 3 steps: washing, filling and capping, total 12 working stations,working process as below:


    (1)Set empty gallon mouth to gallon seat, empty barrel will be washed during headstand situation,2 working station for barrel inserting.

    (2)Washing process will be divided into 3 steps:1, thimerosal washing,4working positions;2,clean water washing,4working positions。Every washing step is set to 8S,after washing,there will be 10S for dripping.

    (3)The gallon after washing will move down 45 degree through the passing chain and will passing out chain and turn over 45 degree by barrel lift cylinder to filling position for filling.

    (4)Filling value will driven by cylinder to insert into barrel and start to fill, filling time is controlled by PLC, and filling time is adjustable by control panel according to filling liquid surface。After filling, the extra water will back to pure water tank by automatic vent,it can reduce water consumption。(water tank is not included).

    (5)After filling process finish,the filled barrel will be pushed to capping position by barrel stop cylinder,the whole process finish till now.


    Sea worthy packing for gallon filling line

    30 working days for gallon filling line


    None

Contact Us Now

We’d love to hear from you!

Contact Us

Copyright © ZhangJiaGang City FILL-PACK Machinery CO., LTD. All Rights Reserved    Technical Support:

Sitemap
Top